Click to explore PTC’s Corporate Experience Center!

By Daniel P. Perruzzi, Jr., AIA, LEED AP, Principal and Senior Partner at Margulies Perruzzi

Predicting the future in real estate is tricky in the best of times. The continuing uncertainty posed by the pandemic makes any prediction that much more difficult. However, we have learned a lot about how real estate and the real estate industry will respond, based on emerging trends.

Workspace

You cannot put the toothpaste back in the tube, just like you cannot make everyone recommit to five days in the office any longer. For many industries, some tasks can be performed better in remote mode. Teamwork and higher quality collaboration tools will be the reasons for maintaining office space, but the hybrid model is here to stay. That does not mean the office goes away. On the contrary, companies will continue to assess their current workspace and upgrade it to meet the higher demand for voice/video calls and meetings that can integrate those who are remote with those present in the office.

Labs

According to a recent industry panel, there is a regional demand for six million square feet of new lab space. Even if that’s wrong by 50 percent, it is still a staggering number. Look for office-to-lab conversions to continue to pick up speed, especially amongst newer, but less fully occupied, office buildings.

GMP space, where the drugs and therapeutics are manufactured, is also at a premium. Because of their demand for services and high-bay space, these will compete for suburban space with industrial uses as that market looks to expand its “last-mile” portfolio.

Environmental Design

While we were all distracted by the pandemic, alarms have been raised on the accelerating deterioration of the environment. All of us in this industry have a role to play in creating a more sustainable future. Buildings account for nearly 70 percent of the emissions in urban centers. Boston is embarking on an ambitious plan to convert buildings to full electrification. Look for other cities and towns in the region to follow suit.

At the same time, a renewed emphasis on health and well-being will mean new challenges in building design.

Diversity, Equity, and Inclusion

The pandemic has exposed the economic and social inequities that afflict our society, including our industry. All the stakeholders in the real estate sector – contractors, engineers, architects, brokers, designers, project managers – have to reevaluate how they source staff, who they choose to work with, and how they procure products. The industry has already begun that effort and must continue in a positive direction. Real estate can provide tremendous, long-term economic opportunity. It is incumbent on all of us to ensure all sectors of our community can reap the benefits.

Will there be curveballs and unexpected challenges? Of course. Look no further than the current supply chain crisis and the impact it is having on construction costs. Very few saw that coming. Inflation also is a problem today that few predicted. If supply chain issues extend well into 2022 and if inflation does not abate soon, we could be in for an easing of this growth period.

Article featured in High Profile Monthly.

 

Partnering with Array Architects, a leader in healthcare planning and design, Margulies Perruzzi focused on incorporating as much access to daylight and nature as possible to leverage its clinical benefits. The team collaborated to situate activity rooms and common areas along the exterior walls of the building to bring in natural light and views of the Maine landscape for both patient and staff areas. Windows were maintained at patient areas while safety glass and borrowed light concepts  were used to bring daylight deeper into the building. Art highlighting nature is incorporated at various seating areas throughout the unit to bring nature inside the building.

The new inpatient unit is secured with access through an interlocking sally port and features 20 double occupancy rooms, each with its own bathroom. To ensure the safety of patients, each room is designed to minimize ligature risk to provide both privacy and safety. Anti-ligature fixtures were used in the bathrooms and bedrooms as well as vandal proof ceilings. The design team used institutional materials with a residential look and feel to help reduce stress by providing a home-like feel for patients on the unit.

Read the full article featured in Healthcare Snapshots.

By Monica Moreira Audette, AIA, LEED AP, Associate Partner and Senior Project Manager at Margulies Perruzzi

A lot more goes into renovating an older Class B building into a Class A than just adding a coffee bar or flat screen TV in the lobby. If it were that easy, all Class B building owners would upgrade. A big part of the decision to renovate a Class B building is the owner’s appetite for risk and how far they are willing to go to achieve a higher rate of return on their property.

It is not a decision any owner can make quickly. Owners will have to methodically weigh the pros and cons of trading the safety and stability of a Class B building for the cachet of Class A. The indicators are nearly endless – tenant demand, the economic forecast, sector growth, businesses that are expanding and/or contracting, emerging space trends (open floor plans, high-end amenities), and changing work styles that require more flexible space.

Office, industrial, retail, warehouse and biotech space have different conditions and variables that cannot be compared across the board. For instance, renovating warehouse space in one region makes sense to accommodate the demand from large retail tenants like Amazon that have specific needs, while in another market it would be a poor investment. The same goes for biotech space – upgrading buildings in a bullet-proof market like Cambridge is a no-brainer but biotech tenants have very specific needs that make renovating a building a costly endeavor.

What to Weigh

Given that the conditions can vary so dramatically from market to market, owners need to look closely at both the micro and macro conditions before considering future renovation plans. They should avoid basing their decisions on what their neighbors are doing given that the building condition, access to capital and the type of tenant improvements will differ.

Converting Class B buildings to A in fail-proof or constrained markets reduces risk. Property owners and managers should pay close attention to market research for leasing trends and supply and demand. The vacancy rate of a property is a crucial factor in the decision-making process for owners who may want to stagger improvements.

Class B buildings in markets where there are high vacancy rates may have a better chance at adding value by making minor changes like upgrading mechanical and operating systems to increase their building’s efficiency rather than a full-scale renovation. If the building is in a market where there is weak demand for Class A space, staying put in Class B until there is a shift could be the best strategy.

Property owners whose buildings have not been properly maintained or have fallen into disrepair are unlikely to be able to justify retrofitting buildings with touchless, digital technology that will play a big role in landing a tenant. Property owners who are planning to retain assets for the long-term have more financial cushion to make investments that will pay off in the future, increasing rents and elevating the class of the property. Those in the game for the short-term who do not have access to capital will favor less costly facelifts over renovation, leaving the new owners the opportunity to add value.

Building owners and managers should enlist a team of experts who can assist in determining the best course in repositioning office buildings. Evaluating the real estate market, comparable properties, and tenant demand will provide a solid starting point to formulate a plan for repositioning a commercial property.

A Medical Makeover in West End

When asset manager DWS Group decided to renovate 50, 60, and 62 Staniford Street in Boston’s West End neighborhood to transform the 70’s era complex into a first-class medical office building they hired Margulies Perruzzi to outline the process from navigating construction with tenants in the building to the Boston planning process.

DWS’ goal was to improve the tenant experience, increase access and add high-quality building features near medical/research institutions such as Massachusetts General Hospital, Shriner’s Hospitals for Children, and Mass. Eye & Ear to attract new tenants.

We evaluated every detail and devised a design scheme that included reducing disruption to tenants to securing city approvals to increasing the building’s Planned Development Area.

Our strategy included connecting 50 and 60 Staniford Streets which increased the ground floor and first floor by 20,000 SF. It also created new space for medical office, dry research, and retail tenants.

The Staniford complex now features a 10-story medical office tower and a new, two-story medical office building with space for retail tenants. The investment by DWS created a premier medical/office space, increasing the value of the complex, and improved access to high-quality space ideal for medical office/retail users.

Article featured in Banker & Tradesman.

By Janet Morra, AIA, LEED AP, Principal and Partner at Margulies Perruzzi

Launched in July 2020 by the International WELL Building Institute (IWBI), the WELL Health-Safety Rating is a concept whose time has come, especially as businesses, institutions and organizations strive to return to an updated version of pre-pandemic normalcy.

IWBI defines the WELL Health-Safety Rating as “an evidence-based, third-party verified rating focused on operational policies, maintenance protocols and emergency plans to address a post-COVID-19 environment now and broader health and safety-related issues into the future.”

The idea was forged during the pandemic’s first wave, one of the earliest results of IWBI’s Task Force on COVID-19. According to IWBI, “nearly 600 public health experts, virologists, government officials, academics, business leaders, architects, designers, building scientists and real estate professionals” participated.

The WELL Health-Safety Rating contains a subset of relevant features from the WELL Building Standard that were adapted for a facilities and operations focus. It promotes indoor safety by providing a means to guide, validate, recognize, and scale management of health and safety issues in shared spaces. IWBI states that “third-party review ensures integrity and consistency, and results in a WELL Health-Safety seal for buildings and spaces that meet the rating’s requirements, communicating leadership and a commitment to the health and well-being of the people who frequent the space.”

At Margulies Peruzzi, we believe that this rating system is to health and safety what LEED is to sustainable design, and that it will gain the same traction among design professionals and owners. Directed towards facility operations and management, the rating is applicable to all new and existing building and facility types across an array of markets and large and small organizations alike. IWBI cites some recognizable names among those that have achieved the rating: Prudential Center, Fairfax County Public Schools, Yankee Stadium, Empire State Realty Trust, JPMorgan Chase, T-Mobile, Four Seasons, Citi, and Brookfield Properties.

IWBI recounts numerous advantages to owners: attracting and retaining employees, clients, and investors; building brand equity through leadership and innovation; and promoting employee health and well-being and in doing so, maximizing productivity.

Program Features

The rating system examines more than 20 features across six main themes – Cleaning and Sanitization Procedures, Emergency Preparedness Programs, Health Service Resources, Air and Water Quality Management, Stakeholder Engagement and Communication, and Innovation. For a facility to earn a WELL Health-Safety seal, a minimum of 15 criteria must be met, including as many as three submissions under Innovation. IWBI provides collateral material, a detailed online guide, and an extensive checklist to help participants through the process. Like the U.S. Green Building Council’s LEED project certification, there is a cost attached to earning this rating. It ranges from a low of $2,730 for a small business at a single location to a capped high of $166,000 for a company with up to to 10,000 locations.

In another similarity to LEED, Green Building Certification Inc. (GBCI) in collaboration with IWBI developed a rigorous process for individual accreditation. Becoming a WELL AP (accredited professional) signifies advanced knowledge in human health and wellness in the built environment, and specialization in the WELL Building Standard.

As part of our firm’s commitment to workplace health and safety for our clients, Margulies Peruzzi supported interior designer Alison Buckley, Associate IIDA, in her successful quest to earn the WELL AP certification.

Workplace Research in the Time of COVID

The workspace is an important physical asset within which a high degree of ingenuity and productivity is enabled. Thus inspired, we launched our first workplace strategy research in 2016, drawing on more than two decades of working with countless companies to help them create optimal work environments. Research continued, and in early 2020 when the world as we knew it changed, we shifted our focus—much like IWBI’s task force—to examining the ramifications of COVID-19 on physical work environments and their occupants.

Kicking off a series of five reports that share current thought leadership on the nature of work and how it and office environments are evolving during this health crisis was Volume 1: COVID-19 and the Future of the Workplace, published in May 2020. It presents the results of a survey we conducted of thousands of industry professionals to gain an understanding of the virus’s impact on the physical office environment. We received more than 500 responses to several fundamental questions:

  • When asked what most excited them about the prospect of returning to their workplace, 90% of respondents cited collaborating in person again and reuniting with colleagues. Coming in second was accessing office resources and equipment (64%), followed by returning to a well-designed, ergonomic workspace (58%), and working in environment that allows them to focus (47%).
  • Regarding their concerns, 80% cited safety in common spaces, followed by social distancing in meeting and collaboration space (70%); work environment cleanliness (68%); interaction with the public, visitors, and vendors (66%); workspace density (60%); and air quality (38%).
  • Working from home provided valuable lessons learned. “Space to concentrate is important” garnered 87% agreement. Other feedback acknowledged the desirability of face-to-face interaction (83%); value of engagement with company culture and mission (82%); ability to be productive remotely (82%); importance of ergonomics (75%); and ability to manage teams remotely (73%).

The report features a 10-page section, “Re-Thinking Office Building & Workplace Design,” that contains product reviews and explores various options that align with WELL Health-Safety Rating features under Air and Water Quality Management, Stakeholder Engagement & Communication, and Innovation. These include MEP improvements; UV lighting for treatment of air and surfaces; screening devices and sensors; information technology; wellness standards that go beyond FitWel, LEED and WELL Building; social changes; furniture solutions; antimicrobial surfaces; infection control risk assessment; and HR strategies for remote and hybrid work.

Volume 2: Reshaping the Workplace was published in August 2020. It asks the key question, “What does the future of office design look like?” in a post-COVID future, and explores impacts on real estate, space metrics and ratios, new concepts in space design, and technologies for space management. Among the challenges that owners and facility managers can look forward to are increases in workplace utilization rates, safety protocols, and need of technology for collaboration; management of a reduced in-person population due to continued remote work; and restoration of employee engagement and culture. It was around this time that the concept of a hybrid work model began to emerge, which intersects with features under four of the six WELL Health-Safety Rating themes.

Rethinking the Corporate Office Building

With a total inventory of over 5.5 billion square feet of office space leased or available for lease in the United States at the end of June 2021, landlords are in the vanguard of building owners who must adapt their assets to support the health and safety of current and prospective tenants. Margulies Peruzzi’s Volume 3: Building Design Reimagined/How Will COVID-19 Affect Building Design? published in September 2020, provides practical guidance to landlords specific to market challenges, tenant needs, building improvements, and space management. The primary logistical and financial challenges we foresaw as tenants returned were the ability to comply with social distancing in common areas, the need to increase security and safety protocols, improving HVAC performance and outside air intake, providing hands-free options, and reductions in public transportation and on-site employees.

Predicting that tenants would have many questions of landlords, the report provided a substantial list that included “What WELL/LEED standards do you have in place?” We forecast that traditional building amenities such as serveries and fitness centers would take on new forms and procedures, and that other innovations such as refrigerated marketplaces and moving conference areas close to lobbies to reduce foot traffic through office spaces would become more common. Presented in two categories (existing and new buildings), the report contains recommendations for potential improvements to parking and building entrances; building lobbies and security desks; elevator lobbies; elevator technology; restroom layout and design; grab-n-go, cafes, and food pickup; markets; fitness centers; HVAC systems and the energy code; and building control systems.

The Path Forward

The shape of future office environments will be largely determined by three factors: the ability of company leaders to direct and manage change; the subsequent development of organization-wide policies concerning remote work, safety, and occupancy; and the financial implications of those policies on facility decisions. A successful transition from the peak pandemic work-from-home scenario to a return-to-office scenario will require a spectrum of expertise and depend heavily on corporate agility and flexibility. Features of the WELL Health-Safety Rating’s Emergency Preparedness Programs theme, in particular the development of emergency, business continuity, and healthy re-entry plans, have a direct bearing on future space planning and allocation.

Margulies Perruzzi’s January 2021 report, Volume 4: Post-COVID Workplace presents four workplace models that corporate leaders can adapt to their own company’s unique blueprint. They are traditional, flexible, balanced, and lean, and range in 25% increments from 100% of the workforce returning to the office in the traditional model, to 25% in the lean model. Each model comes with its own financial and logistical considerations, especially if more space is needed to accommodate social distancing. The graphic below demonstrates how the models compare in terms of cost and space.

How much space do you need?

The New Hybrid Environment

Long a staple in certain high-tech industries and made possible through advancements in digital technology, COVID-19 has pushed the hybrid work environment model to the mainstream. Now, as the world grapples with the delta variant and new facts about its transmissibility to and by the vaccinated, Margulies Perruzzi’s just-released Volume 5 Workplace Strategy Report: Embracing the Hybrid Workspace affirms the logic of transitioning from a traditional to hybrid model. A survey of 8,600 people across multiple business sectors revealed that 44% of workers plan on being in the office three days a week, and 25% plan on two days. Only 9% responded that they would return to a pre-pandemic office presence.

How many days per week do people intend to work in the office?

Corporate leaders are becoming more receptive to the idea that work environments must embrace change as a constant and evolve in response. Catalysts include an increase in workplace utilization rates and safety protocols; restoration of employee engagement and culture; continuation of remote work and subsequent management of a reduced in-person population; and an increased need for collaboration technology and training.

Planning a return to the physical office under ever-changing conditions and advisories from the CDC is yet one more challenge for C-suite executives, facility managers, and employees. The numbers are significant. According to the U.S. Bureau of Labor Statistics, as of July 2021, there were 153.6 million people aged 16 and over in America’s workforce, of which 82.2 million are office based. Of those, 13.2% of full-time workers in all industries engaged in remote work. Although this is down from a high of 35.4% in May 2020, it nevertheless represents more than 10 million workers. That’s a lot of people, square footage, furniture, equipment, and associated costs to consider while simultaneously prioritizing health and safety.

Managing Change

Change is difficult, but meaningful change cannot happen in a vacuum or without confident leadership. Approaching it in an analytical and positive manner can diminish fear of the unknown and promote inclusivity. Informed corporate leaders are adopting sequential steps for creating a practical, sustainable strategy for their companies, the first one being the creation of a framework that identifies employee type profiles and their correlative space needs.

How many assigned and unassigned seats do you need?

Once the framework has been established, the next steps are to:

  1. Determine corporate willingness to change and how to build consensus around change.
  2. Set guidelines for remote work and HR policies.
  3. Confirm the financial implications.
  4. Introduce property technology to manage space utilization on an ongoing basis.
  5. Develop architectural, design, and engineering principles.
  6. Form an implementation plan.

There are many different options available for implementing a safe return to the office, but there is no “one size fits all” solution. The most successful solution will be that which is uniquely tailored to a company’s business model, strategic plan, and corporate culture. Flexibility of both thought and design are the keys to cultivating a successful hybrid work environment.

Drawing a final correlation to LEED, many companies opt to have their facilities designed to various LEED certification levels without pursuing registration. The same approach can be taken with the WELL Health-Safety Rating. Although we advocate participation in both programs, only an owner can weigh the value of either investment against their project goals and budget.

Health & Safety Efforts Backed by Science

Program participants are in excellent company. According to IWBI, globally there are 20,950+ assets enrolled totaling 1.8 billion square feet, with 13,340+ and 1.3 billion square feet rated. At the end of the process, the WELL Health-Safety seal is a tangible and visible reminder that your building’s health and safety efforts are backed by science and validated by a third party. Seeing the seal outside tells employees, visitors, clients, and customers that they will be safe inside.

Article featured in gb&dPRO.

A recent project shows the value of designing to maximize daylighting in a space.

Southern Maine Health Care, in partnership with Maine Behavioral Healthcare, engaged Margulies Perruzzi and Array Architects to renovate a 24,000 SF unit, creating 40 new beds across two floors, and to design a five-bed Emergency Department Acute Psychiatric (EDAP) unit. This project triples the number of short stay behavioral healthcare beds available in York County, Maine.

The design team focused on incorporating as much access to daylight and nature as possible to leverage its clinical benefits. The team collaborated to situate activity rooms and common areas along the exterior walls of the building to bring in natural light and views of the Maine landscape for both patient and staff areas. Windows were maintained at patient areas while safety glass and borrowed light concepts were used to bring daylight deeper into the building. Art highlighting nature is incorporated at various seating areas throughout the unit to bring nature inside the building.

“The design team did a great job of listening to how we care for our patients and how we would be using the space. The new units will allow us to deliver a higher level of care to behavioral health patients,” said Diane Mankus, RN, senior director of behavioral health services at Southern Maine Health Care.

Read the full article featured in Building Operating Management.

Planning a return to the physical office under ever-changing conditions and advisories from the CDC is yet one more challenge for C-suite executives, facility managers, and employees.

The numbers are significant. According to the U.S. Bureau of Labor Statistics, as of July 2021, there were 153.6 million people aged 16 and over in America’s workforce, of which 82.2 million are office based. Of those, 13.2% of full-time workers in all industries engaged in remote work. Although this is down from a high of 35.4% in May 2020, it nevertheless represents more than 10 million workers. That’s a lot of square footage, furniture, equipment, and associated costs to consider.

Long a staple in certain high-tech industries and made possible through advancements in digital technology, COVID-19 has pushed the hybrid work environment model to the mainstream. Now, as the world grapples with increased outbreaks caused by the delta variant and new facts about its transmissibility to and by the vaccinated, Margulies Perruzzi’s just-released “Workplace Strategy Report: Embracing the Hybrid Workspace” affirms the logic of transitioning from a traditional to hybrid model. The company’s survey of 8,600 people across multiple business sectors revealed that 44% of workers plan on being in the office three days a week, and 25% plan on two days. Only 9% responded that they would return to a pre-pandemic office presence.

Read the full article featured in High Profile Monthly.

BOSTON – July 20, 2021 – Margulies Perruzzi (MP), one of New England’s most innovative architectural and interior design firms, has taken an active role working with health care clients to meet the demands of the COVID-19 pandemic and recently worked with Lahey Hospital & Medical Center (LHMC) in Burlington, Mass., to create a 3,100 SF COVID-19 testing lab.

During the COVID-19 pandemic, hospitals and providers across the Commonwealth worked in numerous capacities to respond to COVID-19, caring for thousands of patients, re-configuring care settings, and endlessly innovating to meet the rapidly changing demands of this pandemic.  Throughout this time, hospitals needed to find new ways to meet the growing demands for COVID-19 testing and analysis and support the achievement of the Commonwealth’s goals to grow testing capacity in the state, which was critical to ensuring robust diagnostic testing and surveillance of the spread of the disease.

Lahey Hospital & Medical Center, a world-renowned tertiary medical center known for its innovative technology, pioneering medical treatment and leading-edge research, committed to more than doubling its existing COVID-19 testing capacity to meet the demand. The renovation of existing lab space created a new expanded COVID-19 testing lab with rapid throughput testing capabilities of up to 11,100 tests per day that would allow specimens to be resulted in 24 hours or less.

“To make a project like this happen requires an enormous amount of collaboration and alignment to ensure the entire team is working together to meet the project goals,” said Bob Humenn, AIA, director of healthcare strategy at Margulies Perruzzi. “The project team worked closely with LHMC to be sure the lab design would meet their current testing needs as well as future testing requirements.”

Margulies Perruzzi and Columbia Construction worked with LHMC to create a COVID-19 testing lab designed to accommodate new and larger equipment.  The design/construction team was challenged to complete the COVID-19 testing lab as quickly as possible to meet the immediate needs for COVID-19 testing during the pandemic.  Multiple sites on- and off-campus were explored, and it was determined that creating the COVID-19 testing lab within the main campus laboratory would have the greatest capital and operational cost efficiency. This approach could also be built in the shortest time because the mechanical infrastructure was already in place.  The challenge with this option was restrictions on planning based on available space in the existing lab. Creating sufficient contiguous space needed for the Thermofisher testing equipment involved multiple moves of existing lab services and required renovation within an existing functioning laboratory. There were several strategies to accelerate the process, including team working sessions for material approvals and finishes flexibility to work with materials more readily available. Utilizing quick ship options for materials with unavoidably long lead times and using movable lab furniture to provide more flexibility for delivery, assembling and installation.

“LHMC moved quickly during the pandemic to meet the urgent demand for testing services. It was important that the lab could process a lot of tests quickly, but the space needed to be efficient and functional also. The design and construction teams helped us achieve our goals by taking a more proactive role to address issues immediately as they arose to ensure the new lab could open quickly for the benefit of our patients, colleagues and physicians,” said Michael Slejzer, director of planning, design and construction at LHMC.

Project team members include:

  • Architect/Laboratory Planning: Margulies Perruzzi
  • Construction Manager: Columbia Construction
  • Owner’s Project Manager: Lehrer Cummings
  • MEP/FP: BR+A
  • Commissioning: CMTA

About Margulies Perruzzi

As one of New England’s top architectural and interior design firms, Margulies Perruzzi (MP) designs Workplace, Health, Science, and Real Estate projects that inspire and nurture human endeavor. More information may be found at https://mparchitectsboston.com.