Campanelli Companies commissioned Margulies Perruzzi to provide design services for the repositioning of this real estate asset. Built in 1982, the building required a significant update. MP lead the design strategy for improvements to the building’s exterior and interior.
The exterior work involved repositioning the front access point to a more accommodating area of the building and redesigning two entries in a more current and inviting manner. Other work on the exterior involved a redesign to the ninth floor window envelope to remove an outdated detail and replace it with a more modern design. The exterior building envelope color was also updated.
The interior scope includes a complete redesign of the building lobby, a new contemporary urban café, and a fitness center. MP also updated the materials in the existing conference center and in all core building components on upper floors such as elevator lobbies, toilet rooms and common spaces.