MP was engaged to provide a feasibility study for converting two buildings into multi-tenant facilities for R&D and light manufacturing companies. The site is currently two separate, 80’s era, partially vacant, two-story office buildings totaling approximately 154,000 SF.
To accommodate repositioning the buildings for light manufacturing, the strategy involved removing portions of the second-floor concrete slab and reinforcing the existing columns to create a two-story space that could house manufacturing equipment, racking and storage, process equipment, and other features common to manufacturing and maker space tenants. Options for single and multi-tenant demising were explored in several fit plan scenarios as well as sweeping, but cost-effective solutions for rebranding the dated façade and fenestration, including the adjacent landscape and hardscape.